– Equipment delivery to and service provider transportation to and from the job site.
– Costs to prepare the worksite, including costs to protect existing structure(s), finishes, materials and components.
– Labor setup time and mobilization time are typical for this kind of job.
– Costs for materials and they delivery
– Costs for any work not specifically mentioned on this page.
– Costs for removing, relocating, repairing, or modifying existing framing, surface finishes (including molding) and fixtures, HVAC, electrical, and plumbing systems – or bringing any systems compliant with current building codes.
– Costs for testing and remediation of hazardous materials (asbestos, lead, radon, etc.).
– Sales tax on materials and supplies.
Permit or inspection fees (or portion thereof) required by your local building department for your overall project.
Cabinet Replacement Labor, Basic
Basic labor to replace cabinets with favorable site conditions. Fabricate plumbing cutouts in back panels if needed. Level and secure vanity to wall. Scribe exposed panel edge to wall surface or apply molding at edge. Assemble, install drawers and hardware. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup.